Load Test on Three-Phase Transformer Lab Manual


Conducting a load test on a three-phase transformer is essential for understanding its performance, efficiency, and operational capabilities under different load conditions. This experiment serves to determine the transformer's voltage regulation, efficiency, and ability to handle specified loads. The following is an outline of a lab manual aimed at guiding students through this important practical exercise.


Objective The primary goal of this laboratory experiment is to evaluate the efficiency and performance characteristics of a three-phase transformer under load conditions. Students will learn how to accurately measure input and output parameters, calculate efficiency, and assess voltage regulation.


Equipment Required 1. Three-phase transformer 2. Load bank (resistive or inductive) 3. Ammeter and voltmeter (for both primary and secondary circuits) 4. Wattmeter 5. Phase sequence indicator 6. Power supply 7. Safety equipment (gloves, goggles)


Procedure


1. Setup Begin by assembling the circuit. Connect the three-phase transformer according to the specified wiring diagram. Ensure that all instruments (ammeter, voltmeter, wattmeter) are correctly calibrated and connected in the appropriate sections of the circuit. Verify the phase sequence using the phase sequence indicator.


2. No-Load Test Prior to the load test, conduct a no-load test to measure the core losses and determine the magnetizing current. Disconnect the load bank and apply the rated voltage to the primary side of the transformer. Record the primary current, secondary voltage, and wattmeter readings to analyze core losses.


load test on three phase transformer lab manual

load test on three phase transformer lab manual

3. Load Test After establishing the no-load conditions, connect the load bank to the secondary side of the transformer. Gradually increase the load in predefined steps (e.g., 25%, 50%, 75%, and full load). For each load step, record the following parameters - Primary voltage (V1) - Primary current (I1) - Secondary voltage (V2) - Secondary current (I2) - Input power (P1) and output power (P2)


4. Calculations Using the recorded data, calculate the efficiency of the transformer using the formula \[ \text{Efficiency} (\eta) = \frac{P_2}{P_1} \times 100\% \] Also, determine voltage regulation using \[ \text{Voltage Regulation} = \left( \frac{V_2_{no-load} - V_2_{full-load}}{V_2_{full-load}} \right) \times 100\% \]


5. Analysis Analyze the results gathered from the test. Compare the calculated efficiencies and voltage regulation values for different load levels. Discuss the performance of the transformer and identify any notable trends, such as the impact of increasing load on efficiency.


6. Conclusion Summarize the findings of the load test. Discuss any discrepancies observed between theoretical values and actual measurements, and offer possible explanations. Highlight the significance of understanding transformer operation under load conditions for future applications in electrical engineering.


Safety Precautions Always prioritize safety when working with electrical equipment. Ensure that all connections are secure and that the load is disconnected before any adjustments are made. Use appropriate personal protective equipment and follow laboratory safety protocols.


This lab manual serves to prepare students for practical experiences involving three-phase transformers, enhancing their understanding of electrical concepts in real-world applications. The knowledge gained from the load test will be invaluable in their future engineering endeavors.